An external wall insulation quotation should describe a finished installation on your house. The amount depends on the assessed construction, the chosen system, the elevations included and the work needed around them. A figure for boards and render leaves unanswered questions about surveys, access, fittings, roof alterations and completion. Ask each contractor to price the same written brief and keep optional or unresolved items visible.
Make the proposals comparable
Give each bidder the same elevation drawings or marked photographs and the same description of the intended outcome. Include known defects, earlier insulation and planned changes to windows or roofs. Ask them to explain what they inspected and which assumptions remain. Where one quotation includes design and another expects someone else to supply it, identify that difference before treating their totals as comparable.
A named system should be accompanied by a description of the proposed build-up and its applicability. Ask who checks the existing wall, determines the fixing arrangement and prepares the junction details. If those decisions await investigation, the quotation should say what happens next and which elements of the price could change. An allowance should have a stated basis and an agreed process for replacement with a firm scope.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Quotation item | Question to settle |
|---|---|
| Assessment and design | Which surveys, calculations and junction drawings are included? |
| Preparation | What existing finishes or defects must be dealt with? |
| Insulation system | What exact assembly and finish are being priced? |
| Associated alterations | Who prices roof, sill, pipe and fitting changes? |
| Access and protection | What is included for the whole agreed programme? |
| Completion | Which inspections, reinstatement and records are included? |
Price the junctions as well as the wall area
Two elevations with similar areas can involve quite different work. One might have a clear roof edge and few attachments; another could meet a conservatory, several window types and equipment fixed to the wall. List those features individually. Ask for the proposed treatment and the trade responsible, especially where a fitting must be disconnected, repositioned and tested after the insulation is installed.
INCA’s weathering guidance describes the need for assessed details at system interfaces. A roof-edge solution belongs in the design and quotation, together with any associated roofing work. The same applies to the relationship between the new wall face and retained sills or doors. If the detail is still undecided, keep its cost and programme implications visible instead of assuming it is included within a square-metre rate.

Separate optional choices from necessary work
Ask the quotation to distinguish the specified installation from choices such as a different finish or an additional elevation. A comparison is easier when each option describes its scope and what remains unchanged. If the design requires preparatory repairs, treat those as part of achieving a suitable background rather than as an aesthetic upgrade. Any uncertainty about the wall should have an investigation or decision attached to it.
Write down how an agreed change will be priced and authorised. For example, opening a concealed junction could reveal an alteration that was absent from the available drawings. The contractor should explain the finding, proposed response and effect on the programme before the changed work is instructed. Keep that record with the revised quotation so that the final specification remains clear.

Include access, coordination and completion
Discuss how access equipment is provided, adjusted and retained while associated trades finish their work. Explain any restrictions on deliveries or passage around the building. Agree the conditions for taking access down, including who has inspected the completed details and how outstanding work will be dealt with. A schedule that omits enabling repairs or reinstatement can give a misleading impression of the overall project.
Check what documents are handed over and when payment stages fall under the proposed contract. Keep the identity of the contracting business, the agreed scope, change procedure and any offered warranty terms together for review. For a property discussion, call 01925 918785 with the address and the information already available; then request a quotation based on the assessed work.
Questions and answers
Should I choose the lowest square-metre price?
Compare the complete scope first. Ask how wall area was measured and which preparation, junctions, access and associated trades are included. A unit rate can be useful within a detailed quotation, but it cannot describe every part of the project on its own.
Sources and further reading
- BBA Agrément 18/5503 Product Sheet 1: EWI PRO EPSRelease/version: First issue23 February2018; amendments26June2018,20November2019,13January2020; scheme-transition notice22May2024Source checked: 23 November 2026
- External wall insulation: specification for weathering and thermal bridge controlRelease/version: Cover August 2024 update; foreword April 2024 revisionSource checked: 23 November 2026
- HSE: protecting the publicContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 22 June 2026Source checked: 23 November 2026